A)(-FlGD
ADJUSTMENT PROCEDURES
I
ldling
Current
(1)
Set the volume control to minimum during this adjustment.
(2)
T\En R?51 anil R?52 fully counterclockwise before the
power
ie switch on.
(3)
Always
start fmm cold, and allow 5 minutes to warm up before adjustment.
If the hegtsink is already warm fiom
previous
use
the conect adjustuent can not be made.
(4)
Connect a DC voltmeter to R771 resietor's leads for left channel,
or ta
F"772 for right channel.
(5)
Adjust R751 for Ieft channel,
or R752
for right
channel, so that the
DC
voltneter becomes
4.5
mV
-
15mV.
1-16