EasyManua.ls Logo

JVC GR-SXM335U - Mechanism Phase Check and Adjustment; Loading System Phase Adjustment

JVC GR-SXM335U
123 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-6
2.3 CHECKUP AND ADJUSTMENT OF MECHANISM PHASE
Note:
Pay careful attention to the installing order and phase
of mechanism parts of the loading system.
Fig. 2-3-1 Top of main deck
Fig. 2-3-2 Rotary encoder
Align the hole of the Loading gear
(T) assembly to that of the deck.
Align one of the three holes of
wheel gear to the deck hole.
Align the two holes of the Loading
ring assembly to those of the deck.
Align the hole of the
link lever assembly to
the deck hole.
Align each one link lever
assembly hole and deck
hole to the hole at the
control cam position.
Align this part to each
"Triangle" mark.
A
lign this part to each
"
Triangle" mark.

Table of Contents

Related product manuals