EasyManua.ls Logo

kbice FDFM1JA02 - Initial Water Reservoir Filling; Initial Unit Flushing; Initial Ice Making Process

Default Icon
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
8
info@kbgoodice.com
1. Filling the water reservoir for the first time use
x Remove the reservoir door by simultaneously pulling both sides
outwards.
x Add clean potable water to MAX WATER FILL.
x Replace the magnetically attached door.
2. Flushing the unit for the first time use
x Plug the unit into power. Add Water LED will flash quickly with 5 beeps if
the water reservoir is full.
x Press and hold the Clean button for 3 seconds to start cleaning for
flushing process, the Cleaning LED illuminates (it takes 30 minutes to
complete and the Cleaning LED goes off).
x Unplug the unit when the flushing process is complete.
x Unhook the plug/holder with drain tubes out of the unit back and lower
them to a bucket or sink.
x Press and hold the release buttons on the connectors to disconnect the
plug/holder and release water.
x Reconnect and hook them back to the unit.
2. Making ice for the first time use

Other manuals for kbice FDFM1JA02