2-6 Keysight M937xA PXIe Service Guide
Tests, Adjustments, and Troubleshooting
Before You Begin
2-
Allow the Analyzer to Warm Up
Review the Principles of Connector Care
For online information on connector care, go to
http://na.support.keysight.com/pna/connectorcare/Connector_Care.htm.
To achieve the maximum system stability, allow the network analyzer to
warm up for at least 15 minutes.