Tyre Mobility Kit (if equipped)
9 Tyre inflation pressure gauge
10 Tyre inflation pressure adjustment knob
Using the Tyre Mobility Kit
OMV083042L_5
Operation
1. Shake the sealant bottle.
2. Connect the compressor hose to the compressor hose connector, located on the
sealant bottle (1). Make sure the sealant bottle is sitting upright.
3. Unscrew the valve cap of the damaged tyre and screw the sealant bottle filling
hose onto the tyre valve.
4. Make sure the compressor is turned off.
5. Connect the battery connector and cable to the 12V battery in the following order.
• Red cable: Connect to a battery (+) terminal.
• Black cable: Connect to a battery (-) terminal.
731