DocumentNo.:KE-0015-00 Sheet:22/37
IIIStrainerInstallation
7.3Spacefortheremovalofthescreen
Periodicallythescreenneedstoberemovedforclean-up.Thereforeallowsufficientroom
(indicated as H1 in the illustration below) for the removal of thecap and screen when
installing strainers to pipeline. Refer to the relevant product drawing for dimensional
information.
7.4Installationofshut-offvalvesanddifferentialpressuregauge
Shut-offvalvesmustbeinstalledbothontheupstreamanddownsteamsideofstrainers.
Theuseofdifferentialpressuregaugesisrecommendedtodetecttheloadingofscreens.