EasyManua.ls Logo

Knudson EL 2002 - 13. TRANSPORTATION; MOVING THE MACHINE; 13.1. GENERAL; 13.2. TRANSPORTATION PROCEDURES; 13.3. WHAT TO EXPECT;INSPECT

Default Icon
29 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7/11/2005 VERSION 2.0 29
13. TRANSPORTATION / MOVING THE MACHINE
13.1. GENERAL
During transport/moving, the machine will experience vibration and shock normally associated with
vehicular or trailer transport. Vibration and shock may loosen fasteners.
13.2. TRANSPORTATION PROCEDURES
Ensure that all equipment is secure. Do not leave any loose tools in or around the machine.
Remove any straight or partially bent blanks from machine and discard them.
The machine is now ready for placement onto a trailer, into a truck, or into an appropriate shipping
container. Ensure the entire machine is secured to the transportation vehicle prior to any movement.
13.3. WHAT TO EXPECT/INSPECT
After transporting/moving the machine, review the procedures listed in Section 11 and carry out any
applicable instructions. THE INITIAL INSPECTIONS OUTLINED IN SECTION 11 SHOULD BE
PERFORMED EVERY TIME THE MACHINE IS TRANSPORTED/MOVED.