28 for the inverters
connected to L3 phase.
Be sure to connect share
current cable to units which
are on the same phase.
Do NOT connect share
current cable between units
on different phases.
24V default setting: 21.0V
48V default setting: 42.0V
If self-defined is selected in program 5, this program can be
set up. Setting range is from 20.0V to 27.0V for 24V and 40.0V
to 54.0V for 48V. Increment of each click is 0.1V. Low DC
cut-off voltage will be fixed to setting value no matter what
percentage of load is connected.
Bulk charging time
(C.V stage)
If selected, inverter will
judge this charging time
automatically.
If “User-Defined” is selected
in program 05, this program
can be set up. Setting range
is from 5min to 900min.
Increment of each click is
5min. Otherwise, Keeping
auto-charging time.
If “USE” is selected in program 05, this program can be set up.
Battery equalization enable
Battery equalization disable
(default)
If “Flooded” or “User-Defined” is selected in program 05, this
program can be set up.
Battery equalization voltage
24V default setting: 29.2V
48V default setting: 58.4V
Setting range is 24.0V to 32V for 24V and 48.0V to 64.0V for
48V. Increment of each click is 0.1V.