TT-1617 12/13
INSTALLATION INSTRUCTIONS
Original Issue Date: 12/13
Model: 5/7.5/10EKD and 4/6/8EFKD
Market: Marine
Subject: Seawater Flow Switch Kit GM90489
Introduction
Installation of this kit involves adding a seawater flow
switch and replacing/relocating the seawater pressure
switch with a new switch that provides enhanced
protection for loss or low seawater flow.
Required Tools
The following tools and supplies are needed:
D Electrical tape
D Teflon tape
D Loctite
R
565 general purpose pipe sealant paste
D Drill and 3/16 in. drill bit
D 5/16 in. socket, 1/4 in. drive
D 10 mm socket, 1/4 in. drive
D 15 mm open end wrench
D 13 mm open end wrench
D 3/8 in. open end wrench
D 7/16 in. open end wrench
D 3 in. Phillips screwdriver
D 1/4 in. socket
D 1/4 in. drive ratchet
D Hose cutter knife
D Wire cutter
D Rags
Safety Precautions
Observe the following safety precautions while
performing this procedure.
Accidental starting.
Can cause severe injury or death.
Disconnect the battery cables before
working on the generator set.
Remove the negative (--) lead first
when disconnecting the battery.
Reconnect the negative (--) lead last
when reconnecting the battery.
WARNING
Disabling the generator set. Accidental starting can
cause severe injury or death. Before working on the
generator set or connected equipment, disable the generator
set as follows: (1) Move the generator set master switch to the
OFF position. (2) Disconnect the power to the battery charger.
(3) Remove the battery cables, negative (--) lead first.
Reconnect the negative (--) lead last when reconnecting the
battery. Follow these precautions to prevent starting of the
generator set by an automatic transfer switch, remote
start/stop switch, or engine start command from a remote
computer.
Hazardous voltage.
Can cause severe injury or death.
Operate the generator set only when
all guards and electrical enclosures
areinplace.
Moving parts.
WARNING
Testing live electrical circuits. Hazardous voltage or
current can cause severe injury or death. Have trained and
qualified personnel take diagnostic measurements of live
circuits. Use adequately rated test equipment with electrically
insulated probes and follow the instructions of the test
equipment manufacturer when performing voltage tests.
Observe the following precautions when performing voltage
tests: (1) Remove all jewelry. (2) Stand on a dry, approved
electrically insulated mat. (3) Do not touch the enclosure or
components inside the enclosure. (4) Be prepared for the
system to operate automatically.
(600 volts and under)
Question and Answer IconNeed help?

Do you have a question about the Kohler 4EFKD and is the answer not in the manual?

Kohler 4EFKD Specifications

General IconGeneral
Fuel TypeDiesel
Power Output4 kW
Frequency60 Hz
Voltage120/240 V
Starting SystemElectric
Noise Level68 dBA at 23 ft

Summary

Introduction

Required Tools

Safety Precautions

Hazardous Voltage and Moving Parts

General warning about hazardous voltage and moving parts.

Testing Live Electrical Circuits

Precautions for testing live electrical circuits and potential hazards.

Accidental Starting Warning

Warning regarding accidental starting and battery cable disconnection.

Installation Procedure

Remove Generator from Service

Steps to safely remove the generator set from service before maintenance.

Remove Sound Shield

Instructions for removing the generator's sound shield for access.

Remove High Exhaust Temperature Switch

Procedure for removing the existing high exhaust temperature switch.

Replace Seawater Pressure Switch

Steps to remove, replace, and relocate the seawater pressure switch.

Install Wiring Harness

Guidance for routing and connecting the new wiring harness.

Install Relay in Junction Box

Instructions for mounting and connecting the new relay inside the junction box.

Install Flow Switch

Steps for installing the seawater flow switch, with variations for units with/without siphon break.

Testing and Validation

Check for Water Leaks

Verify for any leaks from new or relocated switches after initial run.

Seawater Flow Switch Test

Procedure to validate the operation of the new seawater flow switch.

Seawater Pressure Switch Test

Procedure to validate the operation of the new seawater pressure switch.

Seawater Flow Switch Maintenance

Cleaning Procedure

Step-by-step guide for cleaning the seawater flow switch.

Service Schedule