3. Install the Base
If aached, remove the faucet from the base.
Drill 1-1/2″ (38 mm) deep holes with a 3/16″ drill bit (provided) using the marked
locations as the centerpoint.
If using concrete as the oor support, use a 3/16″ masonry bit (not provided) to
drill 1-1/2″ (38 mm) deep holes at the marked locations.
Realign the base to the marked position. Verify that the cold supply notch is in the
correct orientation.
Secure the base to the support with the provided screws and washers.
Verify that the base is level, and tighten the screws.
Kohler Co. 7
1443292-2-B