EasyManua.ls Logo

Kohler K-2362 Series - Prepare the Site

Kohler K-2362 Series
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1. Prepare the Site
NOTE: The open position of the supply stop handles must not
extend more than 4-1/2 (11.4 cm) from the finished wall.
Install the 3/8 water supply lines and 1-1/4 drain piping
according to the roughing-in information.
Install wood backing behind the finished wall to provide a secure
material for the anchoring devices. The combined thickness of the
wood backing and the finished wall material must be a minimum
of 1-1/2 (3.8 cm).
Complete the finished wall.
K-2362-4 K-2362-8 K-2362-1
A 4" (10.2 cm) 8" (20.3 cm) Single Hole
A
2-5/8"
(6.7 cm)
18-7/8"
(47.9 cm)
8-1/8"
(20.6 cm)
1/2" (1.3 cm) D. Mounting
Hole in Pedestal
2-1/4"
(5.7 cm)
6" (15.2 cm)
11-1/2"
(29.2 cm)
9"
(22.9 cm)
7-11/16"
(19.5 cm)
1/2" (1.3 cm) D.
Anchor Holes in
Lavatory
4" (10.2 cm)
1-1/4" (3.2 cm)
OD
Finished
Wall
34-1/2"
(87.6 cm)
22-3/4" (57.8 cm)
3/8" Cold
3/8" Hot
Finished Floor
Kohler Co. 3 1020683-2-E

Related product manuals