EasyManuals Logo

Kohler K-4709 Installation Guide

Kohler K-4709
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #11 background imageLoading...
Page #11 background image
7. Installation Checkout
Attach the clips (provided) evenly along the hose and power cord
to organize them.
Wrap the toilet seat with plastic wrap. This will prevent water
from spraying from the toilet during testing.
Plug the power cord into the GFCI- or RCD-protected receptacle.
When the seat is plugged in, the seat will go through a power-up
sequence where the wands will extend and retract, and the power
indicator LED will flash amber then green.
The seat is activated by skin-to-seat contact. Unless otherwise
stated, the seat must be occupied to activate the functions. To
activate the seat controls for testing purposes, when facing the
toilet, place your hand or a damp wash cloth on the right side of
the seat approximately 1/3 from the front of the seat (as
illustrated).
Supply Stop
GFCI-Protected
Receptacle
Kohler Co. 11 1054180-2-F

Other manuals for Kohler K-4709

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Kohler K-4709 and is the answer not in the manual?

Kohler K-4709 Specifications

General IconGeneral
BrandKohler
ModelK-4709
CategoryBathroom Fixtures
LanguageEnglish

Related product manuals