EasyManua.ls Logo

Kohler OPIAZ User Manual

Kohler OPIAZ
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
1102602-A2-D
Installation&UserGuide
Dual-FlushToilet
OPIAZ
ESCALEPERSUADE
PANACHE
OVE
PARLIAMENT
Question and Answer IconNeed help?

Do you have a question about the Kohler OPIAZ and is the answer not in the manual?

Kohler OPIAZ Specifications

General IconGeneral
BrandKohler
ModelOPIAZ
CategoryPlumbing Product
LanguageEnglish

Summary

Tools and Materials

Before You Begin

Toilet Installation Steps

Remove Existing Toilet

Disconnect water supply, flush, and remove the old toilet pan and cistern.

Position Waste Connector

Determine and position the connector between the pan outlet and waste pipe.

Mark Floor Fixing Holes

Use a template to mark the correct positions for floor fixing kit holes.

Floor Fixing Methods

Bracket Fixing Method

Install toilet using bracket, anchor, washer, and screw for floor fixing.

Screw Fixing Method

Install toilet using screws and anchors directly into pre-drilled holes.

Cistern Components

In-Cistern Assemblies

View cistern components for OVE, PANACHE, OPIAZ, PARLIAMENT, PERSUADE, ESCALE models.

Tank to Pan Fixing

Position Cistern on Pan

Center the cistern gasket on the pan inlet and securely tighten the screw.

Connect Supply Hose

Connect the supply shut-off valve to the supply hose and toilet shank.

Install the Push Buttons

Push Rod Preparation

Disassemble, measure, cut, and reassemble push rods for the flush buttons.

Final Assembly and Testing

Fit the tank lid and test the flush buttons, adjusting rods as required.

Install Flush Valve

Flush Valve A Installation

Release and assemble Flush Valve A by turning and pushing components.

Flush Valve B Installation

Release and assemble Flush Valve B by squeezing tabs and pressing components.

Contact and Warranty Information

Related product manuals