6 Final procedures
Final assembly check
- The entire play structure is tightened securely and panels and play activities double-checked
for correct installation.
- Make sure that the entire structure is plumb and level.
Footing
- The footing holes for posts and activities should be back-filled with compacted soil or concrete
as specified in the play activity instructions.
Surface installation
- The footing is fastened into the concrete as specified in the play activity instructions.
ill. 26
Protective surfacing
A resilient protective surfacing must be installed in accordance with the safety standards EN 1176 (EU)
or ASTM 1487 (USA).
Installation of post caps
IMPORTANT! Post caps and all other safety covers should be installed only after the final assembly
inspection has been completed and all fasteners have been tightened securely.
Post caps (A400592-xx + A400593-xx) must be placed on all exposed post ends (ill. 25).
A400593-XXX
A400592-XXX