Commissioning
85
Pos: 40.41 /Übersc hriften/Zwisch enüberschrifte n/A-E/Bei A usführung Zug öse unten @ 36 4\mod_1440602 815428_78.doc x @ 2681595 @ @ 1
For drawbar bottom version
Pos: 40.42 /BA/Ers tinbetriebna hme/Rundballe npresse/Gelenkw elle/Zugöse dr ehen_bei Ausfü hrung Zugöse f ür Untenanh ängung @ 361\ mod_14393881 42667_78.doc x @ 2667275 @ @ 1
Fig.
In order to get more universal shaft clearance, the drawbar eye can be mounted in position (1)
or (2) on the drawbar (3).
• Loosen screw connection (4) using suitable tool.
• Turn drawbar eye in the desired position and mount with screw connection (4) on the
drawbar (3).
Pos: 40.43 /BA/Ers tinbetriebna hme/Rundballe npresse/Gel enkwelle/Gelen kwelle in Gelenkwell enkette ein-/a ushängen_Bil d @ 514\m od_150401299576 2_78.docx @ 3534368 @ @ 1
Fig.
Pos: 40.44 /BA/Ers tinbetriebna hme/Rundballe npresse/Gelenkw elle/Gelenkwelle i n Gelenkwell enkette einhä ngen_Text @ 514 \mod_1504 013508597_7 8.docx @ 3534 469 @ @ 1
• To lock the universal shaft (2) with the universal shaft chain (1), hook the universal shaft
chain (1) into the support (3) at the drawbar.
Pos: 40.45 /La yout Module /---------------Seitenumbruch---------------- @ 0\mod_11961 75311226_0.doc x @ 4165 @ @ 1