3. Align the front and rear output flanges with the
drive couplers; then secure with the
serews and
tighten to
20 ft-lb.
4. Install the front and rear V-belt cooling boots and
secure
with the existing hardware.
5. Connect the stator coil, trigger coil, and gear shift
position switch
collJ1ecto
rs; then attach the engine
ground cable and starter cable and secure with cap
screws and nuts. Tighten
to
8 ft-lb.
6.
Set the inlet air
si
lencer into the frame; then install
th
e exhaust pipe using a new exhaust pipe seal and
grafoil seal.
Ti
ghten the cap screws evenly
to
20
ft-lb and install the muffler retain
er
springs.
3-
45