2-20
The main unit setup procedure > Installation
[CONFIDENTIAL]
4
Check a leveler on the main frame and adjust the horizontal level by rotating level
bolts with 19 mm wrench.
Adjust them as all casters slightly up from floor at the end.
Make sure to adjust the above because the main unit might move if the casters are not up slightly when clearing
the jam by moving the enhancement devices and locate it back to the original position due to pushing the main
unit by the enhancement devices.
5
Reattach the left front upper cover to the original position. (Screw x3)