EasyManua.ls Logo

L-Acoustics KS21 - Rigging Procedures; Flying a Vertical Array with A15-BUMP;A15-RIGBAR

L-Acoustics KS21
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rigging procedures
Rigging procedures
Flying
Flying a vertical array with A15-BUMP/A15-RIGBAR
Type of deployment own array
A15-BUMP/A15-RIGBARRigging accessory
2 x Ø12 mm shackle WLL 1 t (provided)
Min number of operators 2
Risk of falling objects
Verify that no unattached items remain on the product or assembly.
Secondary safety
Use available holes on the rigging accessories to implement a secondary safety.
Assembly
Procedure
1. Prepare a stack of KS21.
Connect each enclosure on both sides before adding the new one.
SHLAK!
KS21 owner's manual (EN) version 2.1 47

Related product manuals