9
P
LP
P
I
J
E
2.4 . Rigging & sails
2.4.2 . Maintenance of the rigging:
Regularly check the standing and running rigging,
at least once a year.
Considering the metal cables:
Have them changed as soon as the rst rust-
spot appears. Check for corrosion, particularly at
connections with the turnbuckles. Check that the end
ttings and the turnbuckles are in good condition.
Considering the synthetic ropes of the backstays,
halyards, sheets, mooring lines, etc.:
Have them changed as soon as the rst signs of wear
and tear or cha ng appear.
Regularly check the other parts of the rigging, sheets,
mooring lines, etc. and have them replaced if worn.
SAIL SURFACE AREA Dimensions
MAIN SAIL 101 m I 21.730 m
GENOA MAXI 70 m J 7,527 m
STAYSAIL 44 m P 21,197 m
CODE 0 152 m E 6,475 m
SPINNAKER
255 m
2.4.1
. Sails speci cations:
SPECIFICATIONS