EasyManua.ls Logo

Lainox NABOO NAGV072 User Manual

Lainox NABOO NAGV072
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
90027911rev04
EN
CAUTION: Read the instructions
prior to using the equipment
INSTALLATION AND
MAINTENANCE MANUAL
NABOO
SAPIENS
AROMA NABOO
AROMA SAPIENS
Question and Answer IconNeed help?

Do you have a question about the Lainox NABOO NAGV072 and is the answer not in the manual?

Lainox NABOO NAGV072 Specifications

General IconGeneral
ModelNABOO NAGV072
TypeCombi Oven
Capacity7 x 2/1 GN
Temperature Range30°C - 300°C
Control TypeDigital
Power SupplyElectric
Number of Shelves7
Control PanelTouchscreen
TimerYes
Programmable Cooking ModesYes
Cooling SystemYes
DoorDouble-glazed
Safety FeaturesOverheat protection

Summary

Technical Data

Electrical Connections and Equipotential Bonding

Points to Remember When Making the Electrical Connection

Water and Drain Connections

Calout (if present)

Gas Connection Procedures

Operating at the Rated Heat Output

Checking Nominal Heat Capacity

Explains how to check burner depth, fan speed, and enter the management screen for burner parameter settings.

Burner Functionality Check

Guides on checking burner ignition, minimum/maximum speed stages, and modifying values using control knobs.

Burner Testing Procedures

Outlines procedures for testing burner functionality, blocking sequences, restarting, and using the "CLIMA" button for open-door tests.

Gas Burner Settings Access

Describes how to access the burner settings via the MENU button, select "Gas" and enter the password for parameter modification.

Changing Burner Parameters

Details how to select burners, change values, and save new settings for ignition, minimum, and maximum speeds.

Burner Functionality and Testing

Explains how to test burner function, use stop/start controls, exit cycles, and check boiler burner settings.

Combustion and Gas Conversion Check

Covers checking CO, CO2 values, and performing gas conversion from natural gas to LPG or vice versa.

Burner Management Screen

Illustrates accessing and navigating the burner management screen to check fan speed, settings, and combustion parameters.

Commissioning and Testing

Pre-Connection Checks

Details checks before commissioning, including protective film removal, vent clearance, connections, safety requirements, and leak checks.

Ignition and Leakage Checks

Describes checking smooth burner ignition, silicone joint integrity, and water circuit leakage.

Related product manuals