EasyManua.ls Logo

Larius 2 - Goperation

Larius 2
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
LARIUS 2 - painting
English
G8
G2
G4
G1
G2
G3
G5
G9
G7
G10
G6
G
OPERATION
START OF THE PAINTING OPERATIONS
Use the tooling after performing all the SETTING UP operations
above described.
Fill tank (G1) with pure and perfectly filtered product.
Connect up the product hose (G2) from the spray gun (G3)
to the flow regulator (G4).
Connect up the air hose (G5) from the spray gun (G3) to the
coupling (G6).
Connect the compressed air plant to the quick connection
(G7); the pressure must be of roughly 6 bar, max. 7,5 bar.
Open the recycling tap (G8).
Start pump by means of the knob (G9); the pump will be set
to work. Let the product recycle for a short period (2 minutes)
and then close the recycling tap (G8).
Set the atomizing air pressure by means of the knob
(G10).
Make a spraying test.
The pump is now ready to work.