EasyManua.ls Logo

Launch TLT240SBA - Page 27

Default Icon
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LAUNCH Electronic Two-post User’
s Manual
20
1# 2#
A
B
C E
D
3563mm(140.28in)
1
3
1
m
m
(
5
.
1
6
i
n
)
3107mm(122.32in)
228mm
(8.98in)
228mm
(8.98in)
Fig. 7c
2
TLT235SCA
U
Model
Base plate symmetric installation is as shown in 7d
1
With total width (A) as the basis, draw two parallel
lines (#1 and #2) on the concrete slab, with the error
within 3mm.Determine the power side column
location on any chalk line, and mark the total width (B)
of the base plate. Mark the points 3 and 4.Starting
from point 3, draw one diagonal line (C), forming a
triangle. In this way, the vertical lines can determine
the location of the two columns.
B
C
A
2#1#
70mm
(2.76in)
3392mm(133.54in)
2582mm(101.65in)
3
4
1
5
.
5
m
m
(
1
3
4
.
4
7
i
n
)
2792mm(109.92in)
4
0
0
m
m
(
1
5
.
7
5
i
n
)
4
3
Fig.7d
1
Base plate asymmetric installation is based on a total width
(A) shown in
7d
2
draw two parallel lines (#1 and #2) on
the concrete slab, with the error within 3mm.Determine a
point B at any point on chalk line #1, based on point B,
move down 131mm, then move right 228mm to get point C.
Based on point B, draw #1’s vertical line M with a length of
A to get point D .Based on point C, draw line M’s parallel
line N with a length of L to get point E. With four points
B,C,D,E, each post’s position can be decided.
E
D
C
B
2#
A
1#
1
3
1
m
m
(
5
.
1
6
i
n
)
228mm
(8.98in)
228mm
(8.98in)
3544mm(139.53in)
3088mm(121.57in)
Fig 7d
2
(C) Diagtools; www.diagtools.eu; diagtools@diagtools.lv; Pernavas 43A, Riga, Latvia, LV-1009; +37129416069

Related product manuals