Pag. 10
English
USER INSTRUCTIONS:
Starting the machine:
1. Remove the machine from its packaging and make sure all packing parts have been taken off (including the
protection bags).
2. Lay the machine on a flat and steady surface far away from hot places and from the water taps.
3. Remove the water tank cover (19) placed on the top of the machine and pull the water tank out paying attention
not to damage the water tubes inside the tank.
4. Rinse the water tank accurately with fresh water.
5. Fill the tank with cold water.
6. Replace the water tank back in the machine and check that the water tubes are not bent and that the filter is
well set on one of them; reposition the tank cover (19).
7. Place the filterholder (8) under the brewing group (5) and turn it from the left to the right. Leave it there so that
it can get warm and it gets ready for use.
8. Open the steam/hot water knob (4).
9. Place an empty jug under the steam/hot water wand (6). Press the steam switch (12) and the coffee/hot water switch
(13).
10. Plug in the machine in the mains. Make sure that the wall socket is of the right voltage.
11. Turn the machine on by pushing the on/off switch (11). The LED light: machine on (14) turns on to confirm the
power supply.
12. When water is delivered from the steam/hot water wand (6), press the coffee/hot water switch (13) and the
steam switch (12) again and close the steam/hot water knob (4).
13. Press the coffee/hot water switch (13) and deliver water from the brewing group (5) for around 2 minutes with
the filterholder inserted (8); after that, stop the delivery by pressing the coffee/hot water switch (13). Wait at
least 1 minute before proceeding with the next operation.
14. Fill the tank with cold water.
15. Open the steam/hot water knob (4).
16. Press the steam switch (12) and the coffee/hot water switch (13) and deliver water for around 2 minutes; after
that stop the delivery by pressing the steam switch (12) and the coffee/hot water switch (13). Close the
steam/hot water knob (4).
17. Wait at least 1 minute before proceeding with the next operation.
18. After completing all these operations, leave the machine on.
Preparing a coffee:
19. Check that the water tank (1) has been filled in with water by looking at the water level indicator (20).
20. Press the on/off switch (11): the LED light “machine on” (14) will turn on. Do this operation only if the machine
is off. If it’s on pass to the following point.
21. As soon as the indicator light (3) turns on, the machine is ready for use.
22. Fit the single cup filter (9) or the two-cup filter (10) into the filterholder (8) that has been warmed up by leaving
it attached to the brewing group as described in point 7.
23. Before preparing your coffee, it is advisable to press the coffee/hot water switch (13) to dispense water for 5
seconds from the brewing group (5) with the filterholder inserted (8), into the drip tray. After dispensing water
for the indicated time, press the coffee/hot water switch (13) in order to stop the purge.
24. Fill the filter with the ground coffee by means of the supplied measure spoon (16): 1+1/2 measuring spoonful
(16) = 1 coffee cup - 3 measuring spoonful (16) = 2 coffee cups. Every time you fill the filter with a spoonful
of coffee, press the coffee with the tamper (15) before proceeding to fill it with the next spoonful, remove any
excess coffee from the rim of the filterholder.
25. Insert the filterholder (8) into the brewing group (5), turn it from left to right with force, then put the cup on the
removable water drip tray grate (7).
26. Press the coffee/hot water switch (13). The pressure value on the manometer (17) should reach the green zone
during the extraction.
27. Once you get the coffee desired quantity, push the coffee/hot water switch (13) again.
28. Remove the filterholder (8) and throw the coffee grounds away. Make sure that the filterholder is clean and
replace it in the brewing group to warm up again.
Preparing a coffee with coffee pods:
29. Check that the water tank (1) has been filled in with water by looking at the water level indicator (20).
30. Press the on/off switch (11): the LED light “machine on” (14) will turn on. Do this operation only if the machine
is off. If it’s on, pass to the following point.
31. As soon as the indicator light machine ready (3) turns on, the machine is ready for use.
32. Fit the pod filter (18) into the filterholder (8) that has been warmed up by leaving it attached to the brewing
group as described in point 7.
33. Before preparing your coffee, it is advisable to press the coffee/hot water switch (13) to dispense water for 5
seconds from the brewing group (5) with the tightened filterholder (8) into the drip tray. After dispensing water
for the indicated time, press the coffee/hot water switch (13) in order to stop the purge.
34. Open the single packed pod not damaging the pod.
35. Place the pod in its filter (18).