EasyManua.ls Logo

LELY WELGER AP 830 User Manual

LELY WELGER AP 830
94 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
LELY WELGER
AP 530 / 630 / 730 / 830 - P23
AP 730
1132.99.03.03 07.14 (Original manual)
Operator Manual

Table of Contents

Questions and Answers:

LELY WELGER AP 830 Specifications

General IconGeneral
TypeRound baler
Bale diameter0.9 - 1.8 m
Bale WeightUp to 500 kg
Net Wrap SystemYes
Twine SystemYes

Summary

1.1 The Lely Welger AP baler

2 Safety

2.1 Safety Instructions

General guidelines for safe operation and maintenance of the AP baler or thrower P23.

2.3 Safety Massages

2.3.1 General Safety

Key safety practices for operating and maintaining the baler, including personal protective equipment and alertness.

2.3.4 Operating Safety

Maintenance Safety

2.4 Safety Decals

2.4.2 Safety Decal messages

Explanation of meanings for various safety decals, including type, meaning, and spare part numbers.

3 Operation

3.1 Operator positions at the machine

Identifies safe operator positions and danger zones around the machine during operation.

3.3 Commissioning

3.3.1 Start up

3.3.2 Coupling and uncoupling the baler to the tractor

3.3.3 Coupling the hydraulic lines*

3.3.4 Connect the drive shaft

3.3.10 Shutdown procedure

3.4 Driving and Transport

3.5 Operation instruction in the field

3.5.3 Adjusting the pick-up

3.5.4 Setting bale density

3.5.5 Setting bale length

3.5.6 Bale thrower P23*

Danger! Throwing bales

Safety warning regarding the risk of injury from thrown bales during operation.

3.5.7 Clearing blockages

4 Troubleshooting

4.1 Faults and Remedies

4.2 Tying faults and remedies

4.2.1 Twine Tying

Diagnosing and fixing common faults related to twine tying, including knot appearance and twine tension.

4.2.2 Wire Tying

4.3 Bale Thrower faults and remedy

5 Maintenance and adjustments

5.1 Maintenance schedules

Scheduled maintenance tasks based on working hours or time intervals (20, 50, 100, 500 hours).

5.2 Maintenance procedure

5.2.2 Changing the transmission oil

Step-by-step guide for draining and refilling the transmission oil in the baler.

5.2.3 Examining and adjusting the cutting mechanism

Adjust the knives

Instructions for installing, adjusting, and maintaining the cutting knives for optimal performance.

5.2.4 Examining and adjusting timing

Timing the packer in relation to the ram

Procedure for synchronizing the packer and ram movements for precise baling timing.

Timing the needles in relation to the ram

5.2.5 Timing the cross-feeder in relation to the packer

5.2.6 Examining ram movement

5.2.7 Examining needle brake

5.2.8 Examine the main drive

5.2.9 Maintain and adjust tying unit

Adjusting the needles

Detailed steps for adjusting needle length, position, and timing for proper tying.

Examine twine holder and knotter

Adjusting the knotter tension

5.3 Lubrication Chart

5.5 Specification

5.6 Tightening Torques

5.2.12 Hydraulic System

Danger! Caution with leaking hydraulic lines

Safety warnings and procedures for dealing with leaking hydraulic lines and fluids.

5.2.13 Thrower belt tensioning

Related product manuals