EasyManua.ls Logo

LELY Hibiscus 915 CD Vario User Manual

LELY Hibiscus 915 CD Vario
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Lely Hibiscus
915 CD Vario
R-H015-1210EN
Operator Manual

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the LELY Hibiscus 915 CD Vario and is the answer not in the manual?

LELY Hibiscus 915 CD Vario Specifications

General IconGeneral
BrandLELY
ModelHibiscus 915 CD Vario
CategoryFarm Equipment
LanguageEnglish

Summary

Trademarks, Copyright and Disclaimer

Preface

Warranty Conditions

Details the warranty terms and conditions for the Lely Hibiscus, including exclusions and limitations.

Registration

Abbreviations

Introduction to Lely Hibiscus 915 CD Vario

Tine Retainers

Explains the function and installation of tine retainers to prevent tines from falling off.

Independent Rotor Lift

Describes the optional system for lifting rotors independently, used with specific transport wheels.

Safety Information

Signal Words

Defines signal words (Danger, Warning, Caution) and their associated hazard levels and potential consequences.

Safety Instructions

Provides essential safety guidelines for operating and maintaining the Lely Hibiscus.

Explanation of Safety Decals

Details the meaning of various safety decals found on the Lely Hibiscus.

Position of Decals

Illustrates the locations of safety decals on the Lely Hibiscus for easy identification.

Operation Procedures

Hydraulic Control Panel

Explains the hydraulic control panel functions and positions for operating the Hibiscus.

Connect Hibiscus to Tractor

Step-by-step guide on connecting the Lely Hibiscus to a tractor.

Disconnect Hibiscus from Tractor

Procedure for safely disconnecting the Lely Hibiscus from the tractor.

Move to Transport Position

Instructions on how to move the Hibiscus from working position to transport position.

Move to Working Position

Guide on transforming the Hibiscus from transport/headland to working position.

Start Raking

Procedure for preparing and starting the raking operation with the Hibiscus.

Move from Working to Headland Position

Steps to move the Hibiscus from its working position to the headland position.

Move to Floating Position

Instructions for setting the Hibiscus to its floating position for contour following.

Stop Raking

Procedure for safely stopping the raking operation and preparing for transport.

Operation Adjustments

Adjust Working Height

Guidance on adjusting the working height of the Lely Hibiscus for optimal raking.

Adjust Working Width

Instructions for adjusting the working width of the Lely Hibiscus.

Adjust Wheel Assembly Height

Steps to adjust the height of the front and rear wheel assemblies.

Adjust Cam Track

Procedure for adjusting the cam track to optimize crop pick and release.

Change Rotor Lifting Mode

How to switch between simultaneous and independent rotor lifting modes.

Adjust Headland Position

Procedure for adjusting the headland position of the Lely Hibiscus.

Maintenance Procedures

Maintenance Every 10 Working Hours

Tasks required for maintenance after 10 working hours.

Maintenance Every 50 Working Hours

Tasks required for maintenance after 50 working hours.

Maintenance Every 100 Working Hours

Tasks required for maintenance after 100 working hours.

Maintenance Every 250 Working Hours

Tasks required for maintenance after 250 working hours.

Maintenance Every 6 Year

Tasks required for maintenance every six years.

Maintenance After Operation

Routine maintenance tasks to perform after each operation.

Maintenance Before Prolonged Storage

Preparation tasks for the Hibiscus before long-term storage.

Maintenance After Prolonged Storage

Tasks to perform after the Hibiscus has been in prolonged storage.

Clean the Hibiscus

Procedure for cleaning the Lely Hibiscus, with precautions for sensitive parts.

Grease All Pivot Points

Guidance on greasing all pivot points on the Hibiscus frame and rotors.

Grease the PTO Shaft

Instructions for greasing the PTO shaft components, including nipples and bearings.

Replace the Gearbox Oil

Procedure for draining and refilling the gearbox oil with the correct type and quantity.

Torque Tighten Tine Arm Carriage Bolts

Procedure for correctly torquing the nuts of the tine arm carriage bolts.

Grease the Cam Track

Instructions on how to grease the cam track for smooth rotor operation.

Replace the Tine(s)

Step-by-step guide for replacing broken or worn tines on the tine arms.

Replace the Tine Arm

Procedure for replacing a damaged tine arm and its support.

Diagrams and Tables

Hydraulic Schematic

Diagram illustrating the hydraulic system of the Lely Hibiscus.

Tyre Pressure Diagram

Shows the recommended tyre pressures for the transport and rotor wheels.

Bolt and Nut Torque Table

Specifies standard torque loads for various bolt and nut sizes used on the Hibiscus.

Troubleshooting Common Issues

Crop Scattered Behind Hibiscus

Solutions for crop scattering behind the machine.

PTO Shaft Overload Clutch Engages

Troubleshooting steps when the PTO shaft overload clutch engages.

Swath Shape Not Ideal

Adjustments to achieve an ideal swath shape.

Incorrect Working Width or Swath Shape

Resolving issues with incorrect working width or swath shape.

Field Not Clean

Solutions for achieving a clean field after raking.

Tine Broken by Excessive Load

Action to take when a tine is broken due to excessive load.

Specifications for Hibiscus 915 CD

Hibiscus 915 CD Model

Technical specifications for the Lely Hibiscus 915 CD model.

Related product manuals