Page 80 - IOM / ROOF-TOP FLEXY™ Series
PLANNED MAINTENANCEPLANNED MAINTENANCE
PLANNED MAINTENANCEPLANNED MAINTENANCE
PLANNED MAINTENANCE
Every 50 hours 2 months 3 months 6 months Annually
Fan motor assembly X
Gas burner X
Terminal unit X
Air-conditioning only
Filters and internal battery X
External battery X
Hot water battery X
Condensate tray X
Refrigerant system X
Permanent operation
Filters and internal battery X
External battery X
Condensate tray X
Refrigerant system X
GENERAL
At least once a year after winter the equipment casing
must be cleaned, inspected and if necessary treated
for corrosion.
The equipment casing is made of aluminium-zinc plate,
with a polyester finish and oven-treated powder, and is
ultra-violet resistant. The assembly is fixed with
stainless steel rivets.
Any corrosion can only be caused by scratches incurred
on assembly or during maintenance of the Rooftop.
MAINTENANCE SCHEDULE
NOTE :
6 monthly maintenance is performed when changing
from the heating season to the air-conditioning season
and vice-versa.
Annual maintenance is performed just before the start
of the air-conditioning season or the heating season,
depending on the unit.