Page 9
The G43UF gas furnace can be installed as shipped in
the upflow position only. Refer to figure 8 for clearances.
Select a location that allows for the required clearances
that are listed on the unit nameplate. Also consider gas
supply connections, electrical supply, vent connection,
condensate trap and drain connections, and installation
and service clearances [24 inches (610 mm) at unit
front]. The unit must be level from front to back and side
to side. The unit may be tilted slightly (maximum 1/2 in.)
from back to front to aid in the draining of the heat ex-
changer. See figure 7.
FIGURE 7
FRONT VIEW SIDE VIEW
AIR FLOW
AIR FLOW
UNIT
FRONT
1/2"
max.
UNIT SHOULD BE LEVEL FROM LEFT TO RIGHT BUT MAY BE
TILTED SLIGHTLY (MAX. 1/2") FROM BACK TO FRONT
TO AID IN THE DRAINING OF THE HEAT EXCHANGER.
NOTE − 1/3 hp blower motors are equipped with four flex-
ible mounting legs, and 1/2 hp blower motors are equipped
with three flexible legs and one rigid leg. The rigid leg is
equipped with a shipping bolt and a flat white plastic wash-
er (rather than the rubber mounting grommet used with a
flexible mounting leg). The bolt and washer must be re-
moved before the furnace is placed into operation. Af-
ter the bolt and washer have been removed, the rigid leg
will not touch the blower housing.
NOTE − G43UF−60D−135 units are equipped with a ship-
ping pad under the blower housing. Remove the shipping
pad prior to operation.
Allow for clearances to combustible materials as indicated
on the unit nameplate. Minimum clearances for closet or al-
cove installations are shown in figure 8.
WARNING
Blower access panel must be securely in place when
blower and burners are operating. Gas fumes, which
could contain carbon monoxide, can be drawn into
living space resulting in personal injury or death.
WARNING
Improper installation of the furnace can result in per-
sonal injury or death. Combustion and flue products
must never be allowed to enter the return air system
or air in the living space. Use sheet metal screws and
joint tape to seal return air system to furnace.
In platform installations with furnace return, the fur-
nace should be sealed airtight to the return air ple-
num. A door must never be used as a portion of the
return air duct system. The base must provide a
stable support and an airtight seal to the furnace. Al-
low absolutely no sagging, cracks, gaps, etc.
For no reason should return and supply air duct sys-
tems ever be connected to or from other heating de-
vices such as a fireplace or stove, etc. Fire, explo-
sion, carbon monoxide poisoning, personal injury
and/or property damage could result.
Installation Clearances
Top
Bottom (Floor)
Left Side
Right Side
Top/Plenum 1 in. (25 mm)
*Front 0
Back 0
Sides 0†
Vent 0
Floor 0‡
*Front clearance in alcove installation must be 24 in. (610 mm).
Maintain a minimum of 24 in. (610 mm) for front service access.
†Allow proper clearances to accommodate condensate trap and
vent pipe installation.
‡For installations on a combustible floor, do not install the furnace
directly on carpeting, tile or other combustible materials other
than wood flooring.
FIGURE 8
Return Air Guidelines
Return air can be brought in through the bottom or either
side of the furnace installed in an upflow application. If the
furnace is installed on a platform with bottom return, make
an airtight seal between the bottom of the furnace and the
platform to ensure that the furnace operates properly and
safely. The furnace is equipped with a removable bottom
panel to facilitate installation.