Do you have a question about the Lennox G60UHV and is the answer not in the manual?
Heating Stages | Two-Stage |
---|---|
Blower Motor | Variable Speed |
Fuel Type | Natural Gas |
Ignition System | Hot Surface Ignition |
Configuration | Upflow/Horizontal |
Heating Capacity | 44, 000 to 132, 000 BTU/h |
Warranty | Limited Lifetime Heat Exchanger Warranty, 5-Year Limited Warranty on covered components |
Improper installation, adjustment, alteration, service or maintenance can cause property damage, personal injury or loss of life.
Can cause injury or death. Turn electrical power OFF before service.
Be careful when servicing unit to avoid sharp edges.
List of optional accessories like Air Filter, EZ Filter Base, CCB1, etc.
Explains static pressure, filter resistance, and zone control application effects on blower performance.
Precautions to protect electronic components from electrostatic discharge during installation and service.
Includes transformer, door interlock, circuit breaker, and integrated control board.
Integrated Control Board is not field repairable; replace entire control if inoperable.
Adjusts the time the blower operates after heating demand is satisfied.
Sets the delay for second-stage heat initiation with a single-stage thermostat.
Configures cooling speed, speed adjustment (+/-10%), and ramping options.
Explains how to review stored error codes and how to clear them.
Sets thermostat mode, second stage delay, and heating blower speed.
Configures cooling speed, adjustment (+/-10%), and ramping options.
ECM motor energy may interfere with pacemakers; distance and shielding reduce interference.
Wait at least five minutes after power off for capacitors to discharge before adjusting speed taps.
Covers preliminary checks, hot surface ignition warning, gas shutdown, and emergency procedures.
Units are CSA certified without modifications.
Guidelines for gas piping installation, connections, material, and leak testing.
Procedures for testing gas supply and manifold pressures.
Shut off unit and remove manometer when finished; replace tap plug.
Details blower operation, temperature rise measurement, and static pressure checks.
Covers maintenance for blower, filters, flue, chimney, and electrical connections.
Ensure blower access panel is secure when unit is operating to prevent gas fume entry.
Procedure for cleaning the heat exchanger and burners using specific tools.
Electrical wiring diagram for specific G60UHV unit models.
Unit must be grounded in accordance with national and local codes to prevent electric shock.
Control performs a self-check of limits and prove switches before heat call.
Describes the heating sequence for two-stage thermostat operation.
Describes the heating sequence for single-stage thermostat operation.
Emphasizes the importance of proper unit grounding for safety.
Control performs a self-check of limits and prove switches before heat call.
Describes the heating sequence for two-stage thermostat operation.
Describes the heating sequence for single-stage thermostat operation.
Jumper settings and wiring connections for various thermostat and accessory combinations.
Identifies causes and corrective actions for unit failure to operate in any mode.
Explains the reverse polarity code and how to correct it.
Explains the improper ground code and how to correct it.
Identifies causes and corrective actions for unit failure to operate in any mode.
Explains common diagnostic codes and their corrective actions.