Page 30
(Unit shownin upflow position withremote trap)
*5’ max.
To Drain
PVC PipeOnly
FieldProvidedVent
Min.1” AboveCondensate
Drain
Connection
1”
Min.
Trap CanBeInstalleda
Maximum 5’ From Furnac
e
2” Max.
CONDENSATE TRAP LOCATIONS
*Piping from furnace must slope down a
minimum 1/4” per ft. toward trap
FIGURE 47
Coil Using A Separate Drain
Condensate
Drain
Connection
ield Provided Vent
” min. 2” max. above
connection)
Evaporator
line required
(Trap at coil is optional)
FIGURE 48
HorizontalFurnace4” Min.to5” Max.above
condensatedrain connection)
FurnaceCondensate
Drain
Connection
From Evaporator Coil
Optional
Condensate Trap With Optional Overflow Switch
FIGURE 49