TABLE 19
OUTDOOR TERMINATION USAGE*
STANDARD CONCENTRIC
4
4
4
4
4
040
2
1
2
1
2
2
1
2
1
2
2
Joint Cementing Procedure
DANGER
DANGER OF EXPLOSION!
Fumes from PVC glue may ignite during system
check. Allow fumes to dissipate for at least 5 minutes
before placing unit into operation.
1 -
2 -
NOTE - Check the inside of vent pipe thoroughly for
any obstruction that may alter furnace operation.
4 -
NOTE - Time is critical at this stage. Do not allow
primer to dry before applying cement.
7 -
NOTE - Assembly should be completed within 20
seconds after last application of cement. Hammer
blows should not be used when inserting pipe.
9 -