EasyManua.ls Logo

LG LP096CD3A - UNIT INSTALLATION

LG LP096CD3A
49 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 22 -
Copyright ©2010 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
3.2.3 UNIT INSTALLATION
1. Remove the shipping screw from the ventilation door.
(See Figure 1)
2. Remove the front gille by pulling it out at the bottom to
release it, then lift it up along the unit top front.
(See Figure 2)
3. Slide the unit into the wall sleeve and secure with 6 screws
through the unit flange holes. (See Figure 3)
4. Reinstall the front grille by hooking the top over the unit top,
then pushing it in at the bottom. (See Figure 4)
Figure 1
Figure 2
Figure 3
Figure 4

Related product manuals