EasyManua.ls Logo

LG LS-J0762YL/NM/NN/NQ - Pumping down

LG LS-J0762YL/NM/NN/NQ
82 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Pumping down
• Procedure
(1) Confirm that both the 2-way and 3-way valves
are set to the open position.
Remove the valve stem caps and confirm
that the valve stems are in the raised
position.
Be sure to use a hexagonal wrench to
operate the valve stems.
(2) Operate the unit for 10 to 15 minutes.
(3) Stop operation and wait for 3 minutes, then
connect the charge set to the service port of
the 3-way valve.
Connect the charge hose with the push pin to
the service port.
(4) Air purging of the charge hose.
Open the low-pressure valve on the charge
set slightly to air purge from the charge hose.
(5) Set the 2-way valve to the closed position.
(6) Operate the air conditioner at the cooling
cycle and stop it when the gauge indicates
1kg/cm
2
g.
(7) Immediately set the 3-way valve to the closed
position.
Do this quickly so that the gauge ends up
indicating 3 to 5kg/cm
2
g.
(8) Disconnect the charge set, and mount the 2-
way and 3-way valve’s stem nuts and the
service port nut.
Use torque wrench to tighten the service port
nut to a torque of 1.8 kg.m.
Be sure to check for gas leakage.
Lo
Closed
Purge the air
Outdoor unit
Indoor unit
Liquid side
Gas side
CLOSE
Open
2-Way
valve
3-Way
valve
CLOSE
-44-

Related product manuals