14. Connect the condensate pump to the ICR
relay of the terminal of the board as shown
in fig. fig 32 & 34 whichever is applicable
Make sure to fasten the pump wire
through the wire clip on the back side of
the control barrier as shown in fig. 33
15. Assembly the unit back following the
reverse order of disassembly.
NOTE: All tube should be inserted into rubber
elbows by at least 1/2 inch
- 32 -
Copyright ©2008 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only