EasyManua.ls Logo

LG Packaged Terminal Air Conditioner - Page 32

LG Packaged Terminal Air Conditioner
59 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14. Connect the condensate pump to the ICR
relay of the terminal of the board as shown
in fig. fig 32 & 34 whichever is applicable
Make sure to fasten the pump wire
through the wire clip on the back side of
the control barrier as shown in fig. 33
15. Assembly the unit back following the
reverse order of disassembly.
NOTE: All tube should be inserted into rubber
elbows by at least 1/2 inch
- 32 -
Copyright ©2008 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
Figure 31
Pump
assembly
Tube #1
Tube #2
Rubber
elbows(3)
Spraying
Tube
Figure 32
BL BL
Figure 34
Figure 33

Related product manuals