Liebert® PDX and PCW™
ThermalManagementSystems
3 to 8 Ton (11 to 29 kW) Capacity,
UpflowandDownflow,60Hz
Installer/User Guide

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Liebert PW011 and is the answer not in the manual?

Liebert PW011 Specifications

General IconGeneral
BrandLiebert
ModelPW011
CategoryControl Unit
LanguageEnglish

Summary

Important Safety Instructions

Arc Flash and Electric Shock Hazard Warnings

Details arc flash and electric shock hazards when working with power-supply disconnect switches and internal components.

Refrigeration System Over-pressurization Warning

Warns about the risk of explosive discharge from over-pressurization of the refrigeration system.

Rotating Fan Impeller Warning

Highlights the risk of injury or death from contact with high-speed rotating fan impeller blades.

Top-Heavy Unit Falling Warning

Warns about the risk of the unit falling over due to improper handling during lifting or moving.

Improper Wiring and Connections Warning

Addresses risks associated with improper wiring and loose electrical connections, leading to fire or damage.

Humidifier Smoke and Fire Risk

Details the risk of smoke and fire from humidifier canister issues, potentially activating safety systems.

Hot Surfaces Caution

Cautions users about contact with hot surfaces like the compressor, lines, and electrical components.

Heavy Parts Handling Caution

Advises caution when handling heavy and lengthy parts like cabinet panels and fan modules.

Harmful Noise Levels Caution

Warns of potential hearing injury from high noise levels and recommends PPE.

Nomenclature and Components

Pre-installation Preparation and Guidelines

Equipment Inspection and Handling

Handling the Unit while Packaged

Instructions for safely handling and moving the unit when it is still packaged.

Removing the Unit from the Skid with a Forklift

Detailed procedure for safely removing the unit from its skid using a forklift.

Piping and Refrigerant Requirements

Refrigerant Piping and Charging

Covers warnings and guidelines for refrigerant piping, evacuation, leak-testing, and charging.

Evacuation, Leak-testing, and Charging Air-cooled Systems with TXV

Details the process for evacuating, leak-testing, and charging air-cooled systems with TXV.

Evacuation, Leak-testing, and Charging Air-cooled Systems with Liebert Lee-Temp™

Explains evacuation, leak-testing, and charging for systems with Liebert Lee-Temp™ head-pressure control.

Evacuation, Leak-testing and Charging Air-cooled Systems with EEV

Covers evacuation, leak-testing, and charging for systems with EEV and unheated receivers.

Electrical Connections

Checklist for Completed Installation

Electrical Installation Checks

Verifies supply voltage, wiring connections, grounding, and component rotation.

Piping Installation Checks

Confirms piping is complete, leak-checked, charged, properly sloped, and supported.

Initial Start-up Checks and Commissioning Procedure for Warranty Inspection

Maintenance

Preventive Maintenance Checklist