● Make sure that pipes and wires are connected.
● Make sure that liquid side valve and air side valve both are completely open.
1. The connection of power source
● Connect the wire to independent power source socket.
● Preparation of remote controller.
● Run the air-conditioner in cooling operation mode for 30 minutes or longer.
2. Performance evaluation
● Test the out and in air temperature.
● ℃ 。Make sure whether the outlet air temperature subtract from inlet s gives more than 10
Test running
Packing list
●
care of it.
●Please refer to the real appliance purchased.Thank you.
Please check the following attach carefully, if part attach isn t useful, please take
Packing list of the indoor unit
Packing list of the outdoor unit
- 16 -
N0.
Name
1
2
3
1
Size/Model
Unit
Remark
Indoor Unit
Set
Quantity
PC
Drain pipe
1
1
2
Remote Controller
Batteries
PC
7#
PC
1
1
Instructions
PC
PC
Certificate
4
5
6
7
8
fresh air tube
PC
1
1
Pipe Protection Ring
PC
Only for ZV series
Only for ZV series
1
Outdoor Unit
Set
Certificate
PC
1
N0.
Name
1
2
3
4
5
6
7
1
1
1
1
Size/Model
Unit
Remark
PC
Plastic Strap
Isolation Strap
Pipe Protection Ring
Luting (putty)
160g
Quantity
ROLL
ROLL
PC
PACKET
High pressure
connection pipe
Low pressure
connection pipe
1
PC
1
8