12
• Loosen the reservoir knobs (7) and remove the lid (8).
• Check that there is no condensed moisture at the bottle or the
sensor surface.
• Place the bottle in the bottle holder (see the right figure).
• Check that the product bottle inserted in the bottle holder is
pressed again the level sensor.
• Insert the product feedline into the bottle and put on the lid (8).
• Uniformly tighten the reservoir knobs (7) by hand.
• Set the depressurizing valve (2) to “ON” position (pressurize).
5 Operation
5.1 Turn on the Unit
Observe the operating manual of the EQ RC50 Integrated Dispenser I-4.0 used.
Turn the power switch (1) to ON
5.2 Main Page