EasyManua.ls Logo

LogTag UTRIX-16 - Page 15

LogTag UTRIX-16
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LogTag UTRIX Work Instruction Manual Revision 1.07 MP Release Page 15/52
CORRECTIVE ACTION
If a PCBA fails this test then attach a process fault card to PCBA and fill in details.
Place in separate marked container for service check. Rejected PCBA’s must be clearly identified and kept
apart from accepted PCBA’s
NOTE:
ALWAYS use the Close button to exit program
DO NOT reset or switch off computer while it is running PCBA Test otherwise production log files
may become corrupted!!
ALWAYS allow tests to complete for a PCBA. If the test is aborted, software closed or the PCBA
removed before a test is completed then it will not pass subsequent tests in later production
because the test software places a software QC mark in the PCBA’s memory at the end of the test.

Other manuals for LogTag UTRIX-16

Related product manuals