18
2. Placing the unit and water connections
1) The frame must be fixed by bolts (M10) to concrete foundation or brackets. The concrete
foundation must be solid and fastened; the bracket must be strong enough and antirust treated;
2) Please don’t stack substances that will block air flow near inlet or outlet area, and there is no barrier
within 50cm behind the machine, or it will affect the efficiency of the heat pump and even stop the
machine;
3) The machine needs an appended pump (Supplied by the user). The recommended pump
specification-flux: refer to Technical Parameter, Max lift ≥10m;
4) When the machine is running, there will be condensation water discharged from the bottom, please
pay attention to it. Please hold the drainage nozzle (accessory) into the hole and clip it well, and
then connect a pipe to drain the condensation water out.
5) Please consult with your local service centre for indoor installation requirements.
3. Water pipe connection
The inlet and outlet water unions can’t stand the weight of soft pipes. The heat pump must be connected
by hard pipes!