36
1. Heat pump checks before use
a. The air inlets and outlets are free of any debris and are not obstructed.
b. Refrigeration pipes or components are not installed in a corrosive environment.
c. Check electric wiring connections are tight and adhere to the electrical schematic
d. Check for water leaks around the machine and all new water connections
2. Refrigerant leak detection
a. Leak testing is prohibited in enclosed areas
b. Any source of ignition is prohibited during leak checks.
c. Leak detection fluids can be used with most refrigerants but the use of products containing chlorine
should be avoided as the chlorine may react with the refrigerant and corrode the copper pipe.
d. Vacuum the machine completely before welding. Welding should only be carried out by a
professional person in a service center.
e. Please stop immediately if a gas leak occurs, and contact your local service center.
3. Trial Run
a. The circulation pump must start before the heat pump and stop after the heat pump to avoid any
damage occurring to the machine.
b. In order to protect the heat pump, the machine is equipped with a time lag start function, the fan will
run 1 minute earlier than the compressor when starting the machine, and it will stop running 1
minute later than the compressor when power off the machine.
c. After the heat pump starts, check for any abnormal noises from the machine