EasyManua.ls Logo

Magneti Marelli Clima-Tech Plus - Page 31

Magneti Marelli Clima-Tech Plus
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Follow the instructions and press Enter.
Filling phase in process
g XXXX
The data is displayed during filling phase.
Filling phase finished
g XXXXX
Process finished
Press ENTER to confirm.
If memory card is present in the device, system diagnostics phase may follow the
refrigerant feeding phase. The system shows the following message:
System diagnostics? Yes
No
Select Yes to start system diagnostics phase. See Chapter Błąd! Nie można odnaleźć
źródła odwołania. Diagnostics.
NB. It is suggested that a diagnosis of the installation is performed even without the
expansion card. Close HP and LP valves. Start the motor and keep the rotational speed at
1 500/2000 r.p.m. Start the A/C system and set the maximum fan speed and minimum
temperature. Wait for the A/C/system to stabilize. Check pressures on the pressure gauges
and the temperature in the main air exit. Start motor and the A/C/system.
If the pressure in the
internal cylinder is not
sufficient to perform filling,
the procedure of stating the
remaining amount should be
performed through the
„suction” port of the A/C
system. Cf. Section 7.