9 RUNNING PROGRAMMED PHASES
Open LP and HP valves on control panel or one of the valves, depending on the A/C
system type.
9.1 Recovery phase
Recycling phase
This message appears on the display for a few seconds.
Recycling in process – qty of recovered
refrigerant g XXXXX
Recovery phase stops automatically when the station detects that the system was
emptied. System leak test is then started.
Min. pressure
growth control
Oil recovery
in process
The station will remove used oil to the used oil tank. (21).
Please wait!
Recycling finished!
g XXXXX
Recovery phase is finished.
9.2 Vacuum phase
Vacuum generation!
Time XX:XX
When the planned vacuum generation time is elapsed, the station starts system leak test.
Leaktightness check
s XXX mBar XXX
Data is presented on the display for a few seconds.
Vacuum finished!
mBar XXX
If increased pressure is detected,
recovery phase is repeated.