EasyManua.ls Logo

Major tech MTD75T - Voltage Measurement Procedures

Major tech MTD75T
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AC Voltage Measurement
1. Insert the black test lead into the negative COM
terminal and the red test lead into the positive V/
terminal.
2. Set the function switch to the position.
3. Connect the test leads in parallel to the circuit under
test.
4. Read the voltage measurement on the LCD display.
DC Voltage Measurement
1. Insert the black test lead into the negative COM
terminal and the red test lead into the positive V/
terminal.
2. Set the function switch to the position.
3. Connect the test leads in parallel to the circuit under
test.
4. Read the voltage measurement on the LCD display.

Related product manuals