M5 – Eco CE
FIRST START-UP
The present manual must be read and understood in detail
before starting-up and using the machine.
The machine is supplied complete on a pallet with hoses uncoupled and
separately packed or dismantled into the relative single parts.
These parts have to be mounted to start-up.
The mixing chamber, the pumping unit and the compressor, possible
dispatched separately, must be assembled. Therefore, the machine must
be lifted from the relative transport pallet.
Only use the relative lifting points to lift the machine! Take
account of the weight and the dimensions of the machine.
Position the machine on a flat and stable base and
make sure that it cannot move by using the brakes on
the wheels.
Installing the compressor
The compressor can be positioned on the specific
support under the machine.
Connect the air hose of the machine to the rapid
closure mechanism
(A) of the compressor.
Connect the electrical cable to the specific socket on
the machine
(B).
Installing the mixing chamber
The mixing chamber can be installed after
installing the compressor.
To do this insert the two horizontal pins
(1) in
both the guides until they block into position,
then turn the mixing chamber downwards
and block with the relative fixing lever
(2).
Connect the electrical cable of the pump motor to the
apposite socket
(3) on the machine.
A
1
2
ATTENTION
ATTENTION
B
3