999 LUFFING JIB OPERATOR MANUAL SAFETY INFORMATION
2
Crane Inspection
To aid in preventing harmful and damaging failure as
previously indicated, regular inspection for signs of
overloading in the following load bearing components is
required. Correct each defect found before placing the crane
into service.
Boom
Counterweight
Backhitch
Rotating Bed
Wire Rope
Pendants and Straps
Hook and House Rollers
When equipped with hook rollers, it is recommended that
each hook roller assembly be inspected daily for any sign of
overloading, to include:
Deformation of roller path
Proper hook roller adjustment
Deformation or cracks in hook roller hanger
Bent hook roller shaft
Damaged bearings
Transporting Crane on Barge
If it is necessary to transport the crane on a barge, ship, or
floating platform when dynamic conditions will be
experienced, the boom must be lowered onto a cradle (or
other support) and the crane’s boom, rotating bed, and
lowerworks must be secured against movement. If the crane
is equipped with a mast, the mast must be securely tied
down with guylines. Failing to take these steps can result in
shock load or side load damage to the boom and mast.

Table of Contents

Other manuals for Manitowoc 999

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc 999 and is the answer not in the manual?

Manitowoc 999 Specifications

General IconGeneral
BrandManitowoc
Model999
CategoryConstruction Equipment
LanguageEnglish

Related product manuals