EasyManua.ls Logo

Mark FBA - Disassembly Procedures; Disassembly of Tanner FBA; Disassembly of Tanner FBA Ultra

Mark FBA
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
Recommissioning:
Perform a visual inspection for damage.
Slowly ll the emptied parts - carefully remove the air.
Open all valves.
Press the main switch.
Turn the system on.
10.2 Disassembly Tanner FBA
1. Turn off the main switch and lock it.
2. Remove the power supply and the electrical
connection in the junction box.
3. Close the hot water supply.
4. Loosen the screws on position 2 (4x) and remove
the front wall.
5. Empty position 5 by opening the discharge pipe.
6. Disassemble the heating medium.
7. Loosen the ceiling screws and remove the unit.
8. Disassemble the rear wall after screws on position
4 (4x), position 3 (3x) and if necessary position 1 (3x)
have been removed and remove the engine.
9. Pull the heat exchanger from the unit.
10. Move both halves by moving vertically.
10.3 Disassembly Tanner FBA Ultra
1. Turn off the main switch and lock it.
2. Remove the power supply and electrical
connection in the junction box “K”.
3. Close the hot water supply.
4. Disassemble the heating medium.
5. Loosen the ceiling screws and remove the unit.
8. Remove the sheet metal screws [1] (12x).
9. Remove rear “R” with attached fan, unit is now still
attached to rear wall.
10. Remove xing screws [2] (3x) for heater.
11. Remove the heater and the mounting plates.

Related product manuals