Massey Ferguson 6400 - Issue 2
02B01.11
Splitting - Perkins Engine / GBA20 Gearbox
Final operations
Remark
Final operations are not especially difficult. They
should be carried out in the reverse order to prelimi-
nary operations. However, it will be necessary during
reassembly to carry out the tightening torques, adjust-
ments and tests described below.
Tightening torques
As required:
• Front cab attachment screw (see chapter 12).
• Screw (2) of connector (1) on main wiring harness
(Fig. 5 and Fig. 12) 2.82 to 3.15 Nm
Topping-up
of coolant to the maximum level marked (radiator,
expansion tank. Fig. 13).
Tests
- air conditioning system (if fitted – see chapter 12).
- Cab suspension (if fitted, see chapter 12).
- All mechanical, hydraulic, electrical and electronic
functions concerned by servicing.
Checking tightness
- Hydraulic unions.
- Bleed screw on control unit of suspended front axle
(if fitted).
Fig. 12
Fig. 13