EasyManua.ls Logo

MASSEY FERGUSON 6455 - Page 81

MASSEY FERGUSON 6455
208 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Massey Ferguson 6400 - Issue 2
02A01.15
Splitting - Front frame / Perkins engine
Final operations
Remark
Final operations are not especially difficult.
They are carried out in reverse order to the preliminary
operations. However, during reassembly, the tight-
ening torques, settings and tests outlined below must
be carried out.
Tightening torque:
- as required, wheel screws or nuts (see chapter 6).
Topping-up:
- of coolant, to the maximum level marked on the
expansion tank (Fig. 29).
Tests:
- air conditioning system (if fitted) (see chapter 12),
- cab suspension (if fitted) (see chapter 12),
- all mechanical, hydraulic, electrical and electronic
functions concerned by servicing.
Check tightness:
- of hydraulic unions,
- of water hoses.
Fig. 29
¤
H

Table of Contents

Related product manuals