05 - Commissioning by installer
Without proper commissioning Maxem is unable to send a current limiting value
to the charging station. This results in OVER CURRENT OF THE GRID CONNECTION.
Therefore always make sure this step is successful.
Turnonthechargingstationorrestartitbytakingothecurrentfor30sec.and
puttingitbackon.Waitatleast1minuteforthechargingstationtostartup.Thisway
youknowthatthechargingstationhasfullystartedup.
Connectthe230VpowersupplytoMaxem.
A.
B.
Maxemhastobeconguredonlinebytheinstallerinordertobecommissioned.
For this go to the (mobile) website:
https://inst all.maxem.io
D.
In case of problems during commissioning, you can contact Maxem support:
+31 20 7708 713
Input: 110 - 240V ~ 0,5A
50/60Hz Max 2,75W
Serial number:
CAT III
Made in The Netherlands.
Registration key:
8 719326 026800
MX4-1-H-000000
0000
Serial number
Registration key
Serial number and registration key can be found on the back side of Maxem.
Wait until the rst 3 status LEDs on Maxem are green. This means that Maxem is
connectedtothenetwork,theinternetandthedatacloud.
C.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the maxem 5 and is the answer not in the manual?

maxem 5 Specifications

General IconGeneral
Brandmaxem
Model5
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals