EasyManua.ls Logo

Maxon GPSLR Series - Operation

Maxon GPSLR Series
33 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
1. Unchain Liftgate by un-
hooking snap hook from
tilt arm (FIG. 16-1).
2. Hold the external up-down
toggle switch in the DOWN
position (FIG. 16-2) until
lowest point of platform
and arms are 6” above the
ground (FIG. 16-3).
DOWN SWITCH
FIG. 16-2
NOTE: If necessary, release the
toggle switch to stop the
platform from moving.
OPERATION
UP-DOWN
TOGGLE SWITCH
LOWEST POINT 6” ABOVE GROUND
FIG. 16-3
Damage will occur if Liftgate
is not in correct position when
operating the slide function.
Ensure platform & arms have
6” of ground clearance, at low-
est point, before Liftgate is run
out from under vehicle.
CAUTION
CAUTION
!
Ensure Liftgate is unchained before you deploy Liftgate for
operation. Possible injury and equipment damage could result.
CHAIN
SNAP HOOK
UNCHAINING LIFTGATE
FIG. 16-1
TILT ARM
6”
GROUND

Other manuals for Maxon GPSLR Series

Related product manuals