EasyManua.ls Logo

Maxon TE-250C - Page 17

Maxon TE-250C
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713
17
3. Lower the platform all the way to the ground
while draining the remaining hydraulic uid.
5. Pull out (no threads) ller cap (FIG. 16-2).
Add 1 gallon of hydraulic uid to reservoir.
Re-install ller cap.
CAUTION
Pump cover must be correctly se-
cured to prevent it from becoming
a hazard. To secure pump cover,
the long side of the holder ats
must butt against pump cover as
shown in the illustration.
7. Bolt on the pump cover as shown
in FIG. 17-1. Torque the 5/16”-18
cover bolts from 10 to 14 lb-in.
6. Stow the Lift and do the CHECKING
HYDRAULIC FLUID procedure in this
section of the manual.
BOLTING ON PUMP COVER
FIG. 17-1
4. Reinstall drain plug (FIG. 16-2).
CAP SCREW,
5/16”-18
(2 PLACES)
HOLDER FLAT
(2 PLACES)
FLAT WASHER,
5/16”
(2 PLACES)
NYLON NUT,
5/16”-18
(2 PLACES)
PUMP COVER
POWER UNIT
(REF)

Related product manuals